Tuas Power plans to convert coal plant to biomass by 2028

Tuas Power aims to eliminate coal in Singapore by converting its TMUC facility to biomass, marking a strategic shift in energy supply for Jurong Island’s industrial base.

Tuas Power, operator of Singapore’s only coal-fired power plant, plans to fully convert its Tembusu Multi-Utilities Complex (TMUC) to biomass by 2028. Located on Jurong Island, the plant provides both electricity and steam for local industrial operations. This transformation marks a structural shift in the country’s energy policy, targeting the phase-out of coal from its power generation mix.

Continuer votre lecture

Accédez à l'intégralité de nos analyses et données

Annuel

facturé en une fois

290€/an

soit 24€/mois

Mensuel

Sans engagement

29€/mois

Premier mois à 4€
Visa Mastercard Amex

Subscribe

Gain access to all our Premium contents.
More than 100+ articles.

Buy Article

Unlock this article and gain permanent access to read it.

Welcome Back!

Login to your account below

Create New Account!

Fill the forms below to register

Retrieve your password

Please enter your username or email address to reset your password.

Are you sure want to unlock this post?
Unlock left : 0
Are you sure want to cancel subscription?
This site is registered on wpml.org as a development site. Switch to a production site key to remove this banner.